Endurance Windpower
Overlanshaw Farm

Installation of an Endurance E3120 wind turbine to power this beautiful organic family farm in the border area of Scotland
Installation of a 50kW Endurance E-3120 at MSU Great Falls
Installing and Endurance S250 at the Allerton Farm in Chilmark, MA

This turbine was lowered to change the tail plane from solid aluminum to clear lexan in an effort to reduce the visual impact to neighbors. Notice on the last slide how the tail is nearly invisible from a distance.
Upgrading to an Endurance S250 from an ARE110 @ the ATG Cabinet Shop
Installing the first grid tied residential wind system in Chilmark

Installing the first grid tied residential wind system in Chilmark
Photos of Glen Harcourt

The inspiration and impetus behind Great Rock Windpower.
Installation Workshop

ARE110 installation at Against the Grain, Cabinetmakers shop, October 2006
E3120 for the National Cemetery

Here we are setting the nacelle for a 50 kW Endurance turbine at the Bourne National Cemetery. This turbine will supply clean energy to a new administration building at the cemetery.
